Phoenix Work Area Animation
Click on image for animation
This animation from Sol 1 shows a mosaic of the Phoenix digging area in the Martian terrain. Phoenix scientists are very pleased with this view as the terrain features few rocks—an optimal place for digging. The mast of the camera looks disjointed because the photos that comprise this mosaic were taken at different times of day. This video also show some of the lander's instrumentation.
The Phoenix Mission is led by the University of Arizona, Tucson, on behalf of NASA. Project management of the mission is by NASA's Jet Propulsion Laboratory, Pasadena, Calif. Spacecraft development is by Lockheed Martin Space Systems, Denver.
Photojournal Note: As planned, the Phoenix lander, which landed May 25, 2008 23:53 UTC, ended communications in November 2008, about six months after landing, when its solar panels ceased operating in the dark Martian winter.